holidays-act · NZ

Public holiday pay rules for NZ construction

Last updated 24 November 2026

By Project Payroll team

How NZ construction employers calculate public holiday pay, alternative holidays, Mondayised dates and site allowances.

Construction workers checking a tablet beside scaffolding on a New Zealand building site

In New Zealand construction, an employee who works on a public holiday must usually receive at least time-and-a-half. If it would otherwise be a working day, they also get a paid alternative holiday.

The basic public holiday rules

The Holidays Act 2003 sets three main outcomes:

  1. If the employee does not work and the public holiday is an otherwise working day, pay them for the day.
  2. If they work on the public holiday, pay at least time-and-a-half for the time worked.
  3. If they work and it is an otherwise working day, they also receive an alternative holiday, often called a day in lieu.

As at November 2026, the minimum payment for hours worked on a public holiday is 1.5 times the applicable public holiday rate. An employment agreement or collective agreement can provide more, but not less.

As at November 2026, New Zealand has 12 statutory public holidays, including the relevant provincial anniversary day. The actual day observed can vary between employees because of Mondayisation and normal work patterns.

As at November 2026, an employer that sets the date of an alternative holiday after agreement cannot be reached must generally give at least 14 days' notice.

Quick comparison

Assume a carpenter earns $32 an hour, normally works eight hours on the day concerned, and has no variable payments affecting relevant daily pay.

Situation Minimum gross payment Alternative holiday?
Does not work, but it is an otherwise working day $32 × 8 = $256 No
Works 8 hours and it is an otherwise working day $32 × 8 × 1.5 = $384 Yes, one full alternative holiday
Works 8 hours, but it is not an otherwise working day $32 × 8 × 1.5 = $384 No
Does not work and it is not an otherwise working day $0 No

The alternative holiday is a whole day. It is not reduced because the worker only came in for a short call-out. If they work one hour on a public holiday that would otherwise be a working day, they can still become entitled to a full alternative holiday.

Is it an otherwise working day?

This is where construction payroll often gets stuck.

An otherwise working day is a day the employee would probably have worked if it were not a public holiday. There is no single roster test. Look at:

  • the employment agreement
  • recent work patterns
  • published rosters and confirmed site bookings
  • whether the employee usually works that weekday
  • reasonable expectations between the employer and employee
  • whether work was available
  • the effect of weather, project delays or a site shutdown

A worker does not lose public holiday pay just because the site closes for the holiday. If they normally work that day, it will usually remain an otherwise working day.

Casual wording in an agreement is not decisive either. A supposedly casual labourer who has worked every Monday for several months may have a good case that a Monday public holiday was an otherwise working day.

Write down the reason for each decision. That helps if a worker later questions the result.

Calculating the amount to pay

For a public holiday not worked, an employee receives relevant daily pay. Average daily pay can be used where relevant daily pay cannot be calculated or where the employee's daily pay varies within the pay period.

Relevant daily pay can include more than base wages. Depending on what the employee would have received that day, it may include:

  • regular overtime
  • productivity or incentive payments
  • taxable site allowances
  • shift payments
  • other payments required under the employment agreement

Genuine expense reimbursements and some discretionary payments are treated differently.

For hours actually worked, the employee must receive at least time-and-a-half. A simple fixed-rate employee may be calculated as hourly rate × hours worked × 1.5. Variable pay, regular allowances and differing shift rates can make the calculation more involved.

Do not assume an all-inclusive hourly rate covers public holidays. The agreement and payroll record should clearly show that the employee received at least the statutory entitlement.

You can test leave and daily pay figures with the NZ leave calculator. For wider checks covering timesheets, approvals and pay runs, see the payroll operations hub.

Mondayised public holidays

Some public holidays are moved to Monday or Tuesday when they fall on a weekend. The observed day depends on whether Saturday or Sunday would otherwise be a working day for that employee.

For example, Anzac Day fell on Saturday, 25 April 2026. For an employee who would not normally work Saturday, it was observed on Monday, 27 April 2026. A regular Saturday worker may instead have observed it on the Saturday.

An employee does not receive two public holiday entitlements for the same holiday. Check the person's normal pattern before loading the date into payroll.

Matariki was Friday, 10 July 2026. Because it fell on a Friday, normal otherwise-working-day tests applied without weekend Mondayisation.

Shifts crossing midnight

Night work creates another trap. If a shift runs across midnight into a public holiday, the public holiday rules may apply only to the hours falling on the public holiday.

The Holidays Act allows an employer and employee to agree that a public holiday will be treated as starting at another time, with a 24-hour period used instead. Put any arrangement in writing. Make sure it does not remove the employee's minimum entitlement.

The same care is needed for call-outs. Record the start and finish times, the date each hour fell on, and whether the day was otherwise a working day.

Taking or paying out the alternative holiday

The employer and employee should agree when an alternative holiday will be taken. It must be a day that would otherwise be a working day for that employee.

If they cannot agree, the employer may choose the date using a reasonable basis and provide the required notice. After the entitlement has existed for 12 months, the employee can ask to exchange it for payment. The employer must agree before it can be paid out.

Untaken alternative holidays are also paid when employment ends. They should not quietly disappear at the end of a project or when a worker moves to another site.

Keep the site records behind the pay

Keep rosters, timesheets, call-out records and approvals with the payroll result. Record:

  • the public holiday involved
  • actual hours worked
  • the otherwise-working-day decision
  • the rate and allowances used
  • whether an alternative holiday was created
  • when that alternative holiday was taken or paid

As at November 2026, employers filing electronically generally send payday filing information to Inland Revenue within 2 working days of payday. A banking delay caused by a public holiday does not remove the need to report the correct pay date and figures.

More on holidays-act →

The Pay Run newsletter

Join the list, payroll for builders, explained fortnightly.

One email. Unsubscribe anytime. We never share your details.

Questions

Do construction workers get time-and-a-half on every public holiday?

They get at least time-and-a-half for the hours they actually work on a public holiday. If they do not work, payment depends on whether the day would otherwise have been a working day.

Does a worker get a day in lieu after a short public holiday call-out?

Usually, yes, if the public holiday was otherwise a working day. Even a short period of work can create entitlement to a full alternative holiday. If it was not otherwise a working day, there is no alternative holiday.

Are site allowances included in public holiday pay?

They can be. Relevant daily pay may include taxable site, shift, productivity or regular overtime payments the employee would have received that day. Genuine expense reimbursements are generally treated differently.

Can we move a public holiday to another day?

An employer and employee can agree in writing to transfer a public holiday to another identified day. The arrangement must meet the Holidays Act requirements and cannot be used to remove the employee's minimum entitlement.

What happens to unused alternative holidays when a project ends?

Moving to another project with the same employer does not cancel the balance. If employment ends, untaken alternative holidays must be included in final pay at the applicable daily pay rate.

Construction payroll

Stop reading about it. Put it on your crew.

Crew Time sends approved site timesheets to Employment Hero. Ask about construction setup and award or EBA rebuild consulting, or book a walkthrough.

15 minutes, your EBA, no sales script.

No lock-in · Published pricing · We reply within one business day