Comparison

Paper timesheets vs CrewTime: the real cost

Paper works because everyone already knows how to use it. The cost shows up later: days blur together by Friday, handwriting gets decoded in the office, hours get re keyed, and by the time labour reaches job costing it is a week old.

15 minutes, your EBA, no sales script.

Muddy stack of handwritten daily paper timesheets on dirt, headed No more paper timesheets, with Project Payroll reads the EBA so you don't
The record most builders still pay from: mud, memory and a Friday afternoon.

Who each one is for

Different tools, built for different environments

Both products are good at what they were designed for. The question is which environment you actually run payroll in.

Paper timesheets

Where paper still makes sense

  • Small crews on one site where the foreman sees every hour worked.
  • Jobs with no allowances, no shift work and no cost code reporting.
  • Short jobs where nobody needs labour cost until the invoice goes out.
  • A crew that will not accept an app yet, which is a real constraint and not a failure.

Project Payroll CrewTime

Where paper starts costing money

  • Multiple sites, multiple jobs a day and labour split across cost codes.
  • Enterprise agreement allowances that depend on work type and location.
  • Anyone who needs labour cost this week, not after month end.
  • Businesses carrying underpayment risk they cannot see in a shoebox of sheets.

Compared

Paper timesheets and Project Payroll CrewTime, capability by capability

  • When hours are recorded

    Paper timesheets
    Reconstructed on Friday afternoon, often from memory
    Project Payroll CrewTime
    Captured at the moment of clock on, on site
  • Accuracy of the record

    Paper timesheets
    Handwriting decoded in the office, then re keyed
    Project Payroll CrewTime
    One record, entered once, no re keying
  • Site allowances

    Paper timesheets
    Only paid if the work type and site were written down
    Project Payroll CrewTime
    Condition flags confirmed by the foreman, priced by the rules engine
  • Multi job days with cost codes

    Paper timesheets
    Split guessed later, if at all
    Project Payroll CrewTime
    Each block lands against the right job automatically
  • Job costing speed

    Paper timesheets
    Labour hits the job about a week late
    Project Payroll CrewTime
    Labour posts to cost codes in the same week it was worked
  • Audit trail

    Paper timesheets
    A folder of sheets, if they all come back
    Project Payroll CrewTime
    Timestamped records, foreman approvals and retained photos
  • Payroll handoff

    Paper timesheets
    Manual entry into payroll, with typos priced in
    Project Payroll CrewTime
    Synced straight through to the pay run
  • Migration effort

    Paper timesheets
    No change, and no improvement
    Project Payroll CrewTime
    Photo Timesheet Capture means paper keeps working on day one

None of this is a criticism of the crew. Paper is a system built for a different era of job costing, and it fails quietly rather than loudly, which is what makes it expensive.

Where we are different

What construction native actually means

  • The silent allowance miss

    When a paper sheet has no work type and no site recorded, the allowance simply never gets paid. Nobody queries it because nothing looks wrong. It surfaces later as a claim, with back pay, interest and a lot of reconstruction.

  • Friday afternoon is not a record

    By Friday, Tuesday and Wednesday have blurred. Start times round, breaks get estimated and overtime sequences get remembered generously in both directions. Capture at clock on removes the guessing.

  • Photo Timesheet Capture, the migration bridge

    You do not have to switch cold turkey. Photograph the sheet, OCR drafts the entries, a human reviews every line before it hits payroll, and the original photo is retained as the audit record.

  • Cost codes without extra work

    Because the job is chosen at clock on, labour posts to the right cost code without anyone splitting hours in a spreadsheet afterwards.

More on the capture side in CrewTime, the pay rules in the EBA knowledge hub and the numbers on pricing.

Paper timesheets comparison questions

Our crew will not use an app. Can we still move?

Yes. Keep the paper process on day one. Photograph the sheets, OCR drafts them, a person reviews before payroll, and you move crews to digital clock on when they are ready.

What does a paper timesheet actually cost us?

Three things: office hours spent decoding and re keying, job costing that arrives a week late, and allowances that never get paid because the sheet did not record work type or site. The third one is the expensive one.

Do we lose the audit trail if we go digital?

You gain one. Punches are timestamped, foreman approvals are recorded, and where a photo of a paper sheet was used, the original image is kept.

Is the OCR trusted on its own?

No. Human review is mandatory before anything reaches payroll. The OCR only drafts.

How long does the change take?

Crews are usually invited by SMS and clocking on the same week. The payroll side runs on our normal migration plan, including a parallel pay run before you rely on it.

Reviewed August 2026. Comparison based on publicly available information.

Get started

Keep your paper process on day one.

You do not have to change how the crew works to fix what the office is doing. Photograph the sheets, we handle the rest, and crews move to clock on when they are ready.

15 minutes, your EBA, no sales script.

No lock-in · Published pricing · We reply within one business day