The allowances builders most often miss are industry, fares and travel, tools, overtime meals, leading hand, first aid, multistorey, underground and distant work allowances. The right payment depends on the worker, site and task.
The tricky bit is that these payments do not all work the same way. Some apply every week. Some apply only for particular hours. Others reimburse an expense. A worker can qualify for several on the same shift.
This article covers the Building and Construction General On-site Award 2020. Start with our Awards hub if you are checking coverage or comparing awards.
The numbers worth knowing
As at October 2026, the general building and construction industry allowance is 6% of the weekly standard rate. The corresponding rate for residential building, civil construction, and metal and engineering construction is generally 4.8%, subject to the award's coverage rules.
As at October 2026, an overtime meal entitlement may arise when an employee works at least 1.5 hours beyond ordinary finishing time. Further meal arrangements can apply after each additional 4 hours, depending on the clause conditions and whether the employer provides a suitable meal.
As at October 2026, leading hand allowance bands distinguish between supervising 2-5 employees, 6-10 employees, and more than 10 employees.
Penalty rates matter as well. As at October 2026, common award settings include 150% for the first 2 hours of Saturday overtime, then 200%, with 200% on Sunday and 250% on a public holiday. The employee's work pattern and clause must still be checked before applying these figures.
Minimum wages and dollar allowance amounts applying from the first full pay period on or after 1 July 2026 should be taken from the current award pay guide or payroll tables. Use the Award Rate Checker rather than copying an old dollar figure from a quote or spreadsheet.
Allowances commonly left off the payroll
| Allowance or entitlement | Common trigger | Where payroll goes wrong |
|---|---|---|
| Industry allowance | Employment in a covered building, residential, civil, or metal and engineering construction category | The base classification rate is entered without checking whether the allowance is already included, or it is added twice |
| Fares and travel pattern allowance | The employee travels to and from construction sites under the award conditions | It is treated as kilometre reimbursement only, or omitted when the worker changes sites |
| Tool allowance | A covered tradesperson must provide and maintain required tools | The employer assumes every worker supplies tools, or pays nothing because some shared tools are on site |
| Overtime meal allowance | Qualifying overtime after ordinary hours | Payroll checks the total shift length but misses notice, meal supply and further meal conditions |
| Leading hand allowance | An employee is appointed to direct or supervise other workers | The worker's classification is increased informally, but the separate allowance is not considered |
| First aid allowance | A qualified employee is appointed to perform first aid duties | A first aid certificate is recorded, but the appointment and allowance are not passed to payroll |
| Multistorey or height-related allowance | Work is performed on a qualifying multistorey project or at a covered height | The allowance is not updated as the building rises |
| Underground or special work allowance | The employee performs covered underground, wet, dirty, hot or otherwise specified work | The site diary describes the task, but payroll receives only ordinary hours |
| Distant work entitlement | Work requires the employee to live away from their usual residence | Accommodation is booked, but fares, travel time, meals or other award requirements are overlooked |
Industry allowance can be missed or doubled
The industry allowance recognises the general disabilities of construction work. These include changing conditions, site conditions and the nature of the industry.
Do not simply add 6% to every construction worker's pay. First confirm that the Building Award covers the employee. Then identify whether the work falls within general building, residential, civil, or metal and engineering construction.
Also check how your payroll rate was built. An award table, payroll library or over-award rate may already include the industry allowance. Adding it again creates an overpayment. Entering a bare classification rate when it is not included creates an underpayment.
Keep a record showing the classification, construction sector, standard rate and allowance treatment. A label saying “site rate” is not enough.
Travel is not just kilometres in a ute
The fares and travel pattern provisions are regularly confused with kilometre reimbursement. They are different concepts.
The award can provide an entitlement because an employee travels to and from a construction site under specified arrangements. Different rules can apply when the employer provides transport, when the employee reports to a depot, or when travel occurs during paid time.
Start by recording where the worker was directed to start and finish. Note whether transport was provided and whether the worker used a private vehicle at the employer's request. A list of hours without site locations will not answer the travel question.
Workers who cannot reasonably return home may fall under distant work provisions instead. Those rules can involve transport, accommodation, meals and travel time. A flat nightly amount does not automatically satisfy every obligation.
Tool allowance needs a trade-by-trade check
A worker carrying a tool bag does not automatically receive every tool allowance. Equally, putting a few shared power tools in the site shed does not automatically remove the entitlement.
Check what tools the award expects the employer to supply and what the employee is required to provide and maintain. The result can vary by trade and apprenticeship status. Written site rules help, but actual practice matters. If the contract says the employer supplies tools while the employee buys and replaces them, payroll should investigate.
Meal allowance is not the overtime penalty
A meal allowance and an overtime penalty pay for different things. One does not replace the other.
When a worker stays back, check the amount of overtime, when notice was given, whether a suitable meal was supplied and whether further overtime was worked. The 1.5-hour checkpoint is important, but it is not the only test.
For example, a carpenter may be owed overtime at 150% or 200% and also qualify for a meal allowance. Paying the meal allowance alone leaves the wage short.
Appointment allowances need evidence
Leading hand and first aid allowances often disappear because appointments happen verbally. A supervisor says, “Keep an eye on the crew,” or asks the qualified first aider to cover the site. Nobody tells payroll.
Record the appointment date, duties, crew size and end date. For a leading hand, update the allowance when the number of employees supervised moves between 2-5, 6-10, or more than 10.
Holding a first aid certificate by itself may not be enough. The employee generally needs to be appointed to perform the role. The roster, site notice and payroll record should tell the same story.
Site conditions must reach payroll
Multistorey, underground and special work allowances depend on facts from the site. Payroll cannot identify them from ordinary timesheets unless the timesheet records the relevant work.
Use clear codes for qualifying conditions. Record the project, date, hours and task. For a multistorey project, review the entitlement as construction progresses. For special work, avoid vague notes such as “site allowance”. State what happened.
Can an above-award rate absorb allowances?
Sometimes an employer can rely on an above-award payment to meet particular award amounts. It is not safe to assume that every allowance has been absorbed simply because the hourly rate is higher.
The contract should clearly identify what the rate is intended to cover. Payroll should compare what was actually paid with what the award required for each pay period. Expense-related allowances may still need separate payment because they reimburse a cost or arise from a specific event.
Keep time, task, site and expense records. Without them, it may be impossible to prove that the worker was better off for the relevant period.
The Pay Run newsletter
Join the list, payroll for builders, explained fortnightly.
One email. Unsubscribe anytime. We never share your details.
Questions
Does every construction worker receive the 6% industry allowance?
No. Coverage and the construction category must be checked first. As at October 2026, 6% applies to the general building and construction category, while a 4.8% setting generally applies to residential, civil, and metal and engineering construction categories. The allowance may already be included in the payroll rate.
Is a travel allowance payable when an employee drives to the same site each day?
It can be. The answer depends on the award's fares and travel pattern provisions, where the employee starts and finishes, and whether the employer provides transport. It is not limited to reimbursement for kilometres driven.
When does the overtime meal allowance start?
As at October 2026, 1.5 hours after ordinary finishing time is an important checkpoint. Notice and meal supply conditions also matter. Further meal arrangements may apply after each additional 4 hours of qualifying overtime.
Can a higher hourly rate include construction allowances?
A higher rate may satisfy some award amounts if the arrangement is clear and the worker receives at least the full award entitlement in each relevant pay period. Do not assume it absorbs expense reimbursements or allowances triggered by particular site events.
What records should builders keep for site allowances?
Keep the employee's classification, work location, start and finish times, overtime, tasks, site conditions, tools supplied, travel arrangements, appointments and crew size. Receipts and accommodation records may also be needed for expense and distant work entitlements.
Construction payroll
Stop reading about it. Put it on your crew.
Crew Time sends approved site timesheets to Employment Hero. Ask about construction setup and award or EBA rebuild consulting, or book a walkthrough.
15 minutes, your EBA, no sales script.
No lock-in · Published pricing · We reply within one business day