Construction worker using a tablet beside building materials on an Australian construction site

Under the Building Award’s standard RDO cycle, an employee works 8 ordinary hours on 19 days. On each day, 0.4 hour is banked. That produces one paid 7.6-hour rostered day off every four weeks.

The basic RDO calculation

The Building and Construction General On-site Award 2020 allows ordinary hours to be arranged as a rostered day off cycle.

As at November 2026, the full-time benchmark is an average of 38 ordinary hours per week.

As at November 2026, the standard RDO cycle covers 20 working days over four weeks. The employee works 19 days of 8 ordinary hours and takes the remaining day as an RDO.

As at November 2026, 0.4 hour accrues for each day worked under that cycle. After 19 days, the balance is:

19 days × 0.4 hour = 7.6 hours

That 7.6-hour balance pays for the RDO.

Another way to picture 0.4 hour is 24 minutes. The employee does not necessarily leave 24 minutes early. They remain at work for the rostered 8 hours, while payroll allocates 7.6 hours as current ordinary time and 0.4 hour to the RDO bank.

For broader award guidance, see the Awards hub. To check the applicable classification and current minimum rate, use the Award Rate Checker.

Worked four-week payroll example

Let’s use a straightforward example.

Sam is a full-time construction employee covered by the Building Award. Sam is on the standard four-week RDO cycle. There is no unpaid leave, overtime or public holiday in this example.

Sam’s assumed ordinary hourly rate is $35.00. This is an example rate, not a statement of the award minimum. The actual minimum depends on classification, level, allowances and the first full pay period affected by an annual wage increase.

As at November 2026, payroll should be using any applicable minimum rates effective from the first full pay period starting on or after 1 July 2026. Check the current award rate rather than carrying forward a 2025 figure.

Here is the cycle:

Week Days worked Attendance hours Current ordinary hours paid RDO hours accrued RDO hours paid Total paid hours
Week 1 5 40.0 38.0 2.0 0.0 38.0
Week 2 5 40.0 38.0 2.0 0.0 38.0
Week 3 5 40.0 38.0 2.0 0.0 38.0
Week 4 4 32.0 30.4 1.6 7.6 38.0
Cycle total 19 152.0 144.4 7.6 7.6 152.0

Sam receives 38 paid hours in each week:

38 hours × $35.00 = $1,330.00 per week

Across the four-week cycle:

152 hours × $35.00 = $5,320.00

The RDO payment itself is:

7.6 hours × $35.00 = $266.00

The $266 is part of the four-week total. It is not an extra payment on top of the ordinary cycle earnings.

Why attendance and paid hours look different

This is where payroll can get messy.

In Weeks 1 to 3, Sam attends for 40 hours but receives 38 hours as current ordinary pay. The remaining 2 hours goes into the RDO balance.

In Week 4, Sam works four 8-hour days. That is 32 attendance hours. Payroll allocates 30.4 hours to current ordinary pay and 1.6 hours to the RDO balance. The 7.6-hour RDO payment then brings the week back to 38 paid hours.

If the RDO falls early in Week 4, the payroll system may show that 7.6 hours is taken before the final 1.6 hours has posted. You can handle this by processing the full cycle together or by allowing the rostered accrual expected later in that cycle. Do not treat an expected timing difference as unauthorised negative leave without checking the roster.

Set the payroll rules correctly

The clean setup is to keep three figures separate:

  1. Attendance hours, meaning the time actually worked.
  2. Current ordinary hours, meaning hours paid now rather than banked.
  3. RDO accrual and usage, meaning hours moved into and out of the RDO balance.

Do not record the 0.4 hour as overtime. Under the standard cycle, the full 8-hour rostered day is ordinary time. Overtime may still apply when the employee works beyond rostered ordinary hours, outside the permitted spread, or in another circumstance covered by the award.

Also check whether all-purpose allowances form part of the employee’s ordinary hourly rate. If an allowance is all-purpose, it generally needs to be included when calculating award payments based on the ordinary hourly rate. A separately reimbursed expense is treated differently.

What happens when a day is not worked

Do not assume every paid day automatically creates 0.4 hour of RDO accrual.

The standard award wording ties the accrual to days worked under the cycle. Paid leave, unpaid leave, workers compensation, public holidays and other absences can affect the calculation differently. The right treatment depends on the award clause, the roster and any applicable enterprise agreement.

For example, an unpaid absence should not simply be processed as 8 unpaid hours while still crediting 0.4 hour to the RDO bank. That would usually overstate both the cycle entitlement and the employee’s balance.

A public holiday that lands on a scheduled RDO also needs attention. Check the award mechanism before paying both entries, moving the RDO or substituting another day. The correct result depends on how the cycle and holiday fall.

Records worth keeping

Keep enough detail to explain the balance to the employee and to an auditor. Your records should show:

  • the employee’s award classification and employment type
  • the agreed or rostered four-week cycle
  • each 8-hour day worked
  • the 0.4 hour credited for each eligible day
  • RDOs taken, substituted or banked
  • the hourly rate used for RDO payments
  • overtime kept separate from ordinary RDO accrual
  • adjustments for leave, public holidays and termination

The quick reconciliation is simple. Multiply eligible days worked by 0.4, subtract RDO hours taken, then compare the result with the payroll balance. If 19 eligible days were worked and no earlier balance exists, the employee should have earned 7.6 hours for that cycle.

More on awards →

The Pay Run newsletter

Join the list, payroll for builders, explained fortnightly.

One email. Unsubscribe anytime. We never share your details.

Questions

Does an employee accrue two RDO hours every week?

Only when they work five eligible 8-hour days under the standard cycle. Five days multiplied by 0.4 hour gives 2 hours. A shorter week, unpaid absence or different roster may change the accrual.

Is the 0.4 hour paid as overtime?

No. Under the standard RDO cycle, it is part of the employee’s ordinary hours. It is banked toward the paid 7.6-hour RDO rather than treated as overtime.

What rate should be used to pay an RDO?

Use the applicable ordinary hourly rate required by the award or enterprise agreement. Include all-purpose components where required. Check the employee’s classification and the current award rate before processing the payment.

Does RDO accrual continue during annual or personal leave?

Do not assume it does. The Building Award ties the standard accrual to days worked. Check the relevant award wording, the employee’s roster and any enterprise agreement before crediting 0.4 hour for an absence.

What happens to unused RDO hours when employment ends?

Review the accrued balance and the award or enterprise agreement termination rules. Any amount that must be paid should use the correct applicable rate. Keep the final reconciliation with the employee’s payroll records.

Can an employee take a different day as their RDO?

A scheduled RDO may be substituted or changed where the award and any applicable agreement allow it. Record the agreement and make sure the payroll balance shows the substituted day rather than paying the same entitlement twice.

Construction payroll

Stop reading about it. Put it on your crew.

Crew Time sends approved site timesheets to Employment Hero. Ask about construction setup and award or EBA rebuild consulting, or book a walkthrough.